4T of steelwork. A platform and supporting structure for an arts project featuring 7 sculptures.
Arts project .
Project Details:
45T of steelwork to the Auditorium in the lower basement.
Intricate design required for seating area.
Limited access, works completed to a tight program.
Project Details:
600T of plant support steelwork.
We are working to a very tight program on this job and the client is very happy with the works carried out to date.
Project Details:
150T of structural steel framework for a data centre. The work includes staircases, platforms and walkways.
Phase 1 was completed in 12 weeks.
Project Details:
Supplied and installed 60 T of temporary steelwork to 9 floors.
Installation was carried out while demolition was in progress and therefore called for very precise planning.
Project Details:
Supply and installation of feature staircase, manufactured from mild steel frame, glass balustrade, stainless steel handrail and stainless steel cladding.
Works carried out with limited access to a live building in central London.
Project Details:
Supplied and installed 80T of steelwork to new 6th floor level, mansard roof and plant rooms.
35T of column and beam strengthening and new lift shaft steel work.
Project Details:
300T of Structural steelwork.
Plant support steelwork, walkways and access plant rooms.
Works carried out to a very tight program and completed on time.
Project Details:
Supply and installation of 60T of framework which incorporated extension to existing mezzanine floors.
30T of column and beam strengthening.
2 Cantilever feature staircases from ground floor to level 2.
Project Details:
80T of steelwork to roof top.
Restricted access to the roof made this a challenging project, however our experienced site team and project managers ensured a very satisfactory outcome for the client.
Project Details:
We have an ongoing contract to design and fabricate transport trolleys for Aircrafts.
These trolleys are used for transporting parts of the aircraft in need of maintenance or repair.
Project Details:
Supplied and installed 50 T of temporary steelwork for the basement wall retention.