WIMBLEDON S-HOOKS CHAINS

Posted on 19th March 2019 by Matthew Dorough
This platform is the last item of steel work for ASME Engineering at the Wimbledon Museum.

Platform was designed over the fire escape stairs to take the new chiller unit for the new level of the Museum that was built by ASME last year.

Fully galvanised to take all elements of outside, with a keyclamp hand rail all around, ladder for access and with S-hook chains to allow removal for servicing of the chiller plan
Back to News